Reference chart
Concrete for a shed slab, by size
A 4 in slab for an 8x10 shed is 1.09 cubic yards, or 49 bags of 80 lb mix. A 10x12 slab is 1.63 yards (74 bags), which is past the point where ready-mix is usually the better buy.
Slab equals the shed footprint, with 10 percent added for waste and uneven subgrade. An 80 lb bag yields 0.6 cu ft and a 60 lb bag 0.45 cu ft.
| Shed | Sq ft | 4 in yd³ | 4 in 80 lb bags | 4 in 60 lb bags | 6 in yd³ | 6 in 80 lb bags |
|---|---|---|---|---|---|---|
| 4x4 | 16 | 0.22 | 10 | 14 | 0.33 | 15 |
| 3x6 | 18 | 0.24 | 12 | 15 | 0.37 | 17 |
| 4x6 | 24 | 0.33 | 15 | 20 | 0.49 | 23 |
| 5x5 | 25 | 0.34 | 16 | 21 | 0.51 | 23 |
| 5x6 | 30 | 0.41 | 19 | 25 | 0.61 | 28 |
| 4x8 | 32 | 0.43 | 20 | 27 | 0.65 | 30 |
| 6x6 | 36 | 0.49 | 23 | 30 | 0.73 | 33 |
| 5x8 | 40 | 0.54 | 25 | 33 | 0.81 | 37 |
| 4x10 | 40 | 0.54 | 25 | 33 | 0.81 | 37 |
| 6x8 | 48 | 0.65 | 30 | 40 | 0.98 | 45 |
| 7x7 | 49 | 0.67 | 30 | 40 | 1.00 | 45 |
| 5x10 | 50 | 0.68 | 31 | 41 | 1.02 | 46 |
| 6x10 | 60 | 0.81 | 37 | 49 | 1.22 | 55 |
| 7x9 | 63 | 0.86 | 39 | 52 | 1.28 | 58 |
| 8x8 | 64 | 0.87 | 40 | 53 | 1.30 | 59 |
| 7x10 | 70 | 0.95 | 43 | 58 | 1.43 | 65 |
| 6x12 | 72 | 0.98 | 45 | 59 | 1.47 | 66 |
| 7x11 | 77 | 1.05 | 48 | 63 | 1.57 | 71 |
| 8x10 | 80 | 1.09 | 49 | 66 | 1.63 | 74 |
| 7x12 | 84 | 1.14 | 52 | 69 | 1.71 | 78 |
| 6x14 | 84 | 1.14 | 52 | 69 | 1.71 | 78 |
| 8x12 | 96 | 1.30 | 59 | 79 | 1.96 | 89 |
| 7x14 | 98 | 1.33 | 60 | 80 | 2.00 | 90 |
| 10x10 | 100 | 1.36 | 62 | 82 | 2.04 | 92 |
| 8x13 | 104 | 1.41 | 64 | 85 | 2.12 | 96 |
| 8x14 | 112 | 1.52 | 69 | 92 | 2.28 | 103 |
| 10x12 | 120 | 1.63 | 74 | 98 | 2.44 | 110 |
| 8x15 | 120 | 1.63 | 74 | 98 | 2.44 | 110 |
| 8x16 | 128 | 1.74 | 79 | 105 | 2.61 | 118 |
| 10x14 | 140 | 1.90 | 86 | 115 | 2.85 | 129 |
| 12x12 | 144 | 1.96 | 89 | 118 | 2.93 | 132 |
| 8x18 | 144 | 1.96 | 89 | 118 | 2.93 | 132 |
| 10x16 | 160 | 2.17 | 98 | 131 | 3.26 | 147 |
| 8x20 | 160 | 2.17 | 98 | 131 | 3.26 | 147 |
| 12x14 | 168 | 2.28 | 103 | 137 | 3.42 | 155 |
| 10x18 | 180 | 2.44 | 110 | 147 | 3.67 | 166 |
| 12x16 | 192 | 2.61 | 118 | 157 | 3.91 | 177 |
| 14x14 | 196 | 2.66 | 120 | 160 | 3.99 | 180 |
| 10x20 | 200 | 2.72 | 123 | 163 | 4.07 | 184 |
| 12x17 | 204 | 2.77 | 125 | 167 | 4.16 | 187 |
| 12x18 | 216 | 2.93 | 132 | 176 | 4.40 | 199 |
| 14x16 | 224 | 3.04 | 137 | 183 | 4.56 | 206 |
| 12x20 | 240 | 3.26 | 147 | 196 | 4.89 | 220 |
| 10x24 | 240 | 3.26 | 147 | 196 | 4.89 | 220 |
| 14x20 | 280 | 3.80 | 172 | 229 | 5.70 | 257 |
| 12x24 | 288 | 3.91 | 177 | 235 | 5.87 | 264 |
| 16x20 | 320 | 4.35 | 196 | 261 | 6.52 | 294 |
| 12x30 | 360 | 4.89 | 220 | 294 | 7.33 | 331 |
Anchors and tools for a slab
Researched picks spread from budget to premium.
Prices change often; the button shows today's price on Amazon.
Other shed reference charts
- Shed size chart
- Equipment footprint chart
- Gravel for a shed pad, by size
- Shed roof pitch chart
- Shed roof snow load table
- Shed paint coverage chart
- Shed permit size thresholds
- Shed cost per square foot
Frequently asked questions
When should I order ready-mix instead of bags?
Once a job passes roughly a cubic yard and a half, about 60 to 70 bags of 80 lb mix, ready-mix is usually competitive even with short-load fees, and it gives a far more consistent slab than batches mixed by hand over several hours.
This page is researched guidance, not professional engineering, legal or building-code advice. Sizes, loads and permit rules vary by product and by town: check your local code and the kit manufacturer's instructions before you build.